Air Circulation Overhaul
SUI added large fans and air circulation, which has greatly improved the quality of work environment for the techs out in the warehouse working on the trucks.
SUI added large fans and air circulation, which has greatly improved the quality of work environment for the techs out in the warehouse working on the trucks.
SUI replaced 16 old rooftop package units that were cooling only with electric heat, and we converted them to heat pumps. This lead to the client saving over $20,000 per year on utilities, even with rising electricity rates in Delaware.
Service Unlimited, Inc. completed the replacement of two cooling towers at the Christiana Hilton, upgrading an essential part of the hotel’s HVAC infrastructure. The installation featured new EVAPCO equipment and brought together the planning, rigging, and mechanical expertise needed to execute a substantial replacement within a confined equipment area. The setting presented a clear logistical…
Service Unlimited, Inc. brought air conditioning to a previously unconditioned factory with the installation of two 60-ton cooling-only packaged units and complete air distribution systems. Delivering a combined 120 tons of cooling, the project made a meaningful difference for employees, who welcomed a more comfortable environment in which to work. The factory maintained 100% production…
Service Unlimited, Inc. installed two Carrier packaged units to provide heating and cooling for Greenville Country Club’s indoor tennis facility, helping create a comfortable environment for members to enjoy the courts throughout the year. The installation included an overhead air distribution system tailored to the facility’s large, open playing areas. Sheet metal ductwork connected to…
Service Unlimited, Inc. brought air conditioning to the entire Immaculate Heart of Mary School for the first time, creating a more comfortable learning environment for students and faculty. The project included a Carrier variable refrigerant flow (VRF) system featuring two heat recovery zones and one heat pump zone, with 36 indoor units served by four…
Service Unlimited, Inc. installed a new 80-ton split system serving the church at Immaculate Heart of Mary. The project combined a major equipment replacement, site improvements, and challenging rigging work, requiring close coordination between SUI and all subcontractors to deliver within the agreed-upon timeframe. Outside, the condensing unit was relocated from its original location, with…
Service Unlimited, Inc. (SUI) installed a Variable Refrigerant Flow (VRF) system to serve the facility’s second-floor training area, including its new state-of-the-art virtual training center. The VRF system was selected to provide efficient, responsive heating and cooling while supporting the varying occupancy and load demands of the training space. Its zoning capabilities allow for more…
Service Unlimited, Inc. completed a 90-ton rooftop HVAC unit replacement on a tight turnaround, bringing together careful planning, close subcontractor coordination, and weekend work to make it happen. The project replaced an aging McQuay unit with a new Carrier rooftop system. An installation of this scale requires precise coordination well before the equipment reaches the…
Service Unlimited, Inc. installed a 10-ton and a 27.5-ton packaged HVAC unit to serve a warehouse where precise temperature and humidity conditions are essential to protecting the customer’s product. With a combined 37.5 tons of cooling capacity, the installation supports the environmental requirements of the storage space. The project included outdoor equipment set on a…